Proje Hakkında

This industrial plant located in Cerkezkoy-Tekirdag was built for Putzmeister, the worldwide leader in concrete pump manufacturing. The facility was constructed on a 100,000m² plot of land and has a total construction area of 20,300m². The plant consists of a steel production building, a paint house, Testing Center, Power Plant, and an Administration Building. Features of the project include prefabricated reinforced columns, steel space frame roof truss, cassette facades, trapezoidal roof claddings, epoxy and corundum flooring.

Construction Area 24.000 m2