2 Projects

Metin Sabanci Spastic Children Rehabilitation Center

Place Istanbul
Start Date 1994
Completion Date 2000
Proje Hakkında

Designed and built by KORAY, this 8,500m² project was built on a 35,750m² plot of land and consists of 2 semi-circular shaped buildings, an umbrella shaped steel construction between these buildings and tube shaped walkways which connect the premises. The buildings contain educational and recreational areas, physiotherapy and ergotherapy rooms, psychiatric analysis laboratories, specially equipped classrooms, a hydrotherapy pool, gyms, workshops, administrative offices, cafeterias, dormitories, a 200-person conference hall and a library.

Construction Area 10.876 m2
Architect Haluk Tümay